GMHBA Geelong Office

A nine level office tower over ground floor retail and basement car parking. The building form steps back creating terraces at multiple levels and reducing its overall visual bulk. The structural scheme has been designed to enable setbacks without the need for extensive transfers.

Project Type
Commercial
Client
Quintessential Equity
Architect
COX Architecture
Builder
Kane Construction
Construction Cost
$35,000,000

Projects